Unprecedented achievements in Indian Coal Industry
Technical team of the company is headed by the Founder member Mr Gopal Singh, an IITian, who served
the Indian Mining Industry for about 40 years and shouldered various responsibilities including those of
Chairman of Central Coalfields Ltd, Bharat Coking Coalfields Ltd, Central Mine Planning & Design Institute
and Coal India Ltd. Mr. Singh (B. Tech, M. Tech, MBA, PhD scholar) has the passion for learning, research,
mine planning & mining operations.
Most of the largest coal mines of India have been planned under his direct leadership. Some of them are:
i. MAGADH Mine of CCL in Jharkhand with peak annual capacity of 70 MT.
ii. KUSMUNDA Mine of SECL in Chhattisgarh with peak annual capacity of 62.5 MT.
When Mr. Singh joined Kusmunda mine as Project Officer, the mine’s production was only about
6 MTY. It was because of his vision & planning acumen that the annual peak capacity of the mine
was enhanced to 62 MTY and Kusmunda produced about 42.34 MT in FY 2019-20 and is likely
to touch the peak level in near future.
iii. AMRAPALI Mine of CCL in Jharkhand with peak annual capacity of 35 MT.
iv. Annual capacity expansion of GEVRA Mine to 70 MT was initiated by Mr. Singh.
Mr. Singh served as Chairman of Govt coal companies continuously for 9 years which is unprecedented
for any CMD in coal sector and a rarest feat for any CMD in Govt PSUs.
During this period 6 Greenfield Coal Mines with total peak annual capacity of more than 120MT and
two major railway projects including Magadh Mine, Amrapali Mine, Tori-Shivpur Railway line, Mcluskiganj
- Piparwar Railway line were commissioned. It’s worth mentioning that these projects were lying pending
for about decades and miscreants/ mafias were not allowing these projects to get completed. It was
because of leadership qualities and ethical, philanthropic & decisive approach of Mr. Singh that these
projects could be started.
Not only this, Mr. Singh successfully turned around Central Coalfields Ltd, a company which was
heading towards becoming a sick company. During the period (2010- 13) CCL’s production was stagnating
around 48 MTY. Coal reserve of major mines Piparwar, Ashoka, Kalyani etc. was depleting fast.
Consequently, CCL’s production was bound to come down to 25 MTY.
It was because of Mr. Singh’s planning, design & exceptional leadership qualities that CAGR of coal
production during a period of 4 years, after Mr. Singh took over as CMD, jumped to 7.6% which was just
0.5% during the preceding period of 4 years. Thus, the growth in CAGR of coal production during a period
of 4 years (Pre & Post Mr. Singh as CMD) was a whopping 1361 % which is unprecedented probably in the
history of coal mining in India.
All the major problems of mining and railway projects were duly resolved by Mr. Singh, CCL is likely to
produce more than 70 MT during the current year and is bound to produce more than 100 MT by 2025-
26.
Advisors
- Mr. S. K. Srivastava, IAS, Former Secretary (Coal) & Special Secretary (Mines), Govt of India.
- Mr. Sanjay Kumar, IFS, Former Director General (Forest) & Special Secretary (Ministry of Environment & Forest) Govt of India
- Mr. B. B. Singh Former Chairman (MSTC)
- Mr. Deepak Nath (IRTS), Former COM (EC Railway)
Domain Experts
All the domain experts are highly qualified & experienced Mining Engineers,
Geologists, Civil Engineers, Electrical & Mechanical Engineers & HR experts. All of
them without even a single exception have worked for more than 30 years on
average in senior positions in middle level management in renowned companies
like CMPDI, MECL, MECON, CCL, ECL, BCCL, WCL, MCL, SECL, etc.
IT, Supply Chain and Logistics
The division is headed by Mr. Shashank Shekhar, a Computer Science Engineering graduate from BIT MESRA and MBA from SP Jain, SINGAPUR with specialization in LOGISTICS. He has multi-dimensional experience of serving companies like INFOSYS, ADANI Enterprises, BAJAJ Power & BHP BILLITON (the world’s largest mining behemoth). Mr. Shashank has the diverse experience of having worked in countries like SINGAPORE & AUSTRALIA.Business and Finance
The team is headed by Mr. Mrigank Shekhar an Electrical & Electronics Engineer who served MNCs like ABB GLOBAL, RSM INTERNATIONAL and completed his MBA from IIM. His expertise is strategy and finance.Advocates and Administrators
Tramino has Advocates & Administrators also as its team members which
make it very easy to tackle law & order problems and help the client in tackling
the major mining challenges including taking Statutory clearances and physical
possession of required land with the help of the company’s FOUNDERS.
“Customer Satisfaction is our MOTTO.” Tramino offers services to its clients as a package deal on turnkey basis or in pieces as per the convenience of its clients.
- Short listing of Coal Blocks for Commercial Mining.
- Technical & IT support during Tendering Process.
- Geomatics Services.
- Statutory clearances & other permissions.
- Exploration and Preparation of Geological Report.
- Geological Modeling using MINEX Software.
- Preparation of Hydro-geological Report, etc.
- Acquisition & Physical Possession of Land.
- Mine Modelling using MINEX Software.
- Mine Planning & Design.
- Preparation of Mine Plan and DPR.
- Mine Development including planning & construction of civil & engineering infrastructure.
- Procurement of goods & services.
- Training and Development.
- Economic consulting.
- Dispute Resolution.
We have shortlisted more than 10 Coal Blocks for commercial mining during last about two years for our esteemed clients. Out of these, 8 mines have already been taken by the investors and vesting orders have been issued, two are under 2nd attempt of auction. All the mines that we shortlisted have seen multiple players eventually generating interest and bagging the Blocks in subsequent/second attempt of auctions after our clients chose to focus on prioritized Blocks. We have been the leader in the Market for shortlisting of coal blocks and subsequent formalities, as is evident from the recent Auctions. Our competence is defined by our multifaceted and comprehensive approach to shortlisting and subsequent required actions.
Recent Services
- 10 Coal Blocks Shortlisted for commercial mining.
- 2 Iron ore blocks Shortlisted for commercial mining.
- 1 Coal block Exploration under progress.
- 1 Hydrogeological report Preparation under progress.
- 1 Detailed Project Report for coal block under preparation.
- 4 Coal blocks shortlisted by us under auction in the current (6th/16th) tranche, etc.